What Is The Procedure For Slotting Machine Operation?

October 13, 2025
  1. Before the machine tool is started, it is necessary to carefully check whether the cutter, nut and the screws of each part are firm. If any looseness is found, it must be tightened in time;
  2. Pay attention to the cutting direction when installing the tool, and it is not allowed to reverse;
  3. The main tool turns clockwise;
  4. Before feeding and slotting, first confirm whether the pneumatic device is open and press the workpiece on the movable push table and close to the positioning plate, and the hands are not allowed to approach the knife edge;
  5. When the machine tool breaks down, the power supply should be cut off immediately, and the operation should be stopped, and a special person should be sent to repair and adjust, and the machine tool is not allowed to run sick;
  6. Before processing the material, first check whether there are iron nails, sand joints, etc. on the tool, so as to prevent the damaged tool joint from flying out and hurting people;
  7. The power of the machine tool must be cut off when cleaning the machine tool, lubricating oil, removing and changing the saw blade and cleaning the cutting edge debris;
  8. The machine tool must be operated, adjusted and maintained by designated personnel, and those who are not familiar with the machine tool are strictly prohibited from using it;
  9. Workers should wear earplugs, protective glasses and other labor protection supplies when operating.
  10. The maintenance of the machine shall be carried out in accordance with the "Equipment Operation, Maintenance and Maintenance System".